1. Home
  2.  > 
  3. News
  4.  > 
  5. Industry News
  6.  > 
  7. The working principle of limestone crushing plant

The working principle of limestone crushing plant

Time:2018-03-21 14:05:57

We help you built your project

在线客服 Inquiry 021-2023 6178
    HGM series micro powder grinding mill mainly consist of main unit, classifier, powder collector, dust cleaner, induced draft fan, muffler, sound-proof room, crusher, bucket elevator, storage hopper, and vibrating feeder.
    After crushed by hammer crusher, the large materials become small ones and are sent to storage hopper by elevator ,and then evenly sent to the upper distribution plate of the turn plate by vibrating feeder and sloping feeding pipe.
    When the grinding mill is at work, the main bearing and each dial are driven by electromotor of main equipment through reducer, and all the grinding rollers are rolling in the ring channels driving by dial through plunger. The material are driven to the edge of the turn plate by the centrifugal force and fall down into the grinding chambers where the materials are repeatedly pressed, crushed and grinded by the rollers. Then the materials fall into multiple layers and to be crushed and ground continuously to micro powder.
    The high -pressure air blower constantly inhales air within the grinding mill and, in turn, the airflow with crushed materials are bought to the classifier whose high-speed impeller will screen the airflow:the unqualified particle size will fall and return to the mill for being reground while the qualified particle size mixed with air will go into the cyclone powder collector. Most of the qualified powders will fall and exit from the discharging valve at the bottom; a small proportion of the fine powders, with airflow, moves to the dust cleaner,and clings to the surface of the filter bags. At the same time, the fine powders clinging to the surface fall down by the sudden vibration of the filter bags, which is caused by the instantly ejected  high-pressure gas controlled by the pulse valve. The materials from the above two lots are sent by the conveyor at the bottom to get finished powders packed. In addition, filtered clean air will be emitted from the air outlet of muffler in the end.

E-mail: sunshine@clirik.com


 

  • 20 + Mining Mill R & D
  • 350000 + Factory Space
  • 160 + Engineers & SaLes
  • 200000 + Customers Choice

CONTACT US

Leave your Inquiry

客服
  • Answer Within 60 Seconds
  • Feedback Within 15 Minutes
  • Set Plan Within 24 Hours

ALL RIGHTS RESERVED © CLIRIK technology and cloud computing service support-91 Internet

Online Contact
Contact us Hot Line:021-20236178
back